Hudson®® Polyurethane Floor Varnish Topcoat and Sealer
Hudson®® Polyurethane Floor Varnish Sealer is an aromatic, two-component urethane sealer that provides for the good adhesion of Hudson®® Polyurethane Floor Varnish Topcoat.
Hudson®® Polyurethane Floor Varnish Topcoat is an aromatic, two-component urethane topcoat that provides wooden surfaces a tough, non-slip, mar-resistant film upon curing.
Technical Data
Principal Uses
It is ideal for interior parquets and wooden floors.
Vehicle Type
Urethane
Finish
Gloss
Dry Time
Recoat: 6 hours
*Measured at 25°C and 50% relative humidity
Density
(±0.05 kg/L)
Part A: 0.88
Part B: 1.15
Theoretical Coverage
20-25 sq. m. at DFT
*Depending on surface texture and porosity
Tinting
Not applicable
Thinning
Solvent
Hudson®® Polyurethane Floor Varnish Reducer
Clean-up
Solvent
Hudson®® Polyurethane Floor Varnish Reducer
Packaging
Sealer
3.5-Liter cansTopcoat
3-Liter cansApplication
By brush or spray
Dry Film Thickness
1.5-1.0 mils
SURFACE PREPARATION
For new applications, use only kiln-dried wood. Sand surface until wood is smooth to the touch. Hammer all nails deep enough to apply wood filler. Dust off surfaces completely then wipe with a clean rag. If repainting, remove all paint by manual or mechanical methods prior to the application of Hudson®® Polyurethane products.
MATERIAL PREPARATION
3.5-Liters of Hudson®® Polyurethane Floor Varnish Sealer should be thoroughly mixed with ½ Liter of its catalyst. The product workability is only for 4 hours, maximum. Any unused material will gel.
Hudson®® Polyurethane Floor Varnish Topcoat is mixed with its catalyst on a 3:1 ratio by volume, respectively. Maximum workability of mixture is 4 hours. Any unused material will gel.
PAINTING SCHEDULE
1st and 2nd coats:
Hudson®® Polyurethane Floor Varnish Sealer
Hudson®® Polyurethane Floor Varnish Sealer
3rd to 5th coats:
Hudson®® Polyurethane Floor Varnish Topcoat
Allow the product to cure for 3 days for foot traffic abrasion and 7 days for heavy-duty use.
Hudson®® Polyurethane Floor Varnish Topcoat
Allow the product to cure for 3 days for foot traffic abrasion and 7 days for heavy-duty use.
For MSDS requests, please email technical@boysen.com.ph